Split image: a desk buried in mismatched house plans labeled Designed every time, next to two approved plan sheets on a clean desk labeled Designed once

Levittown built up to 30 homes a day.

Today, a single-family home takes an average of 8.8 months to build. What changed?

Last Friday we walked through how we got here: redlining, zoning, a different rulebook in every town, the 2008 crash, subsidizations, smaller crews, and pricier materials. I ended on this: the first key to affordable homes has been hiding in plain sight since 1947.

Today we open it.

PART 2 · SECTION 1

Key 1 is standardization

Standardization means a home is designed, engineered, priced, and approved once, then built many times.

It doesn't mean every home looks the same. It means the hard, expensive work happens one time instead of on every lot.

What Levittown actually figured out

In 1947, Levitt and Sons started building on potato fields on Long Island. By 1951, there were 17,447 homes.

They didn't do it with new tools. They did it by breaking a house into 26 steps and sending crews from lot to lot, each crew doing the same step on every house. The house stayed still, and the work moved down the street. By mid-1948, they were finishing as many as 30 homes a day. A typical home sold for about $7,990.

The trick was never the speed. Speed was the result. The trick was to decide on the design once, so every crew, every supplier, and every bank knew exactly what they were building and what it cost. Everyone agreed on one thing.

And yes, Levittown also showed us what not to repeat. Its homes were sold only to white buyers. The lesson to keep is the method, not the gatekeeping. Standardization has to be for everyone this time.

PART 2 · SECTION 2

The biggest builders never stopped doing it

Here's the part that surprises people. The largest homebuilders in America still work this way.

D.R. Horton is the biggest homebuilder in the country by homes closed. In fiscal 2025, it closed 84,863 homes across 126 markets in 36 states. It doesn't get there by drawing a brand-new house for every lot.

Drive through almost any large new community, and you'll see it. The same handful of floor plans, repeated street after street. Sometimes the same plan shows up a few neighborhoods over, from the same builder, under a different model name, with a different face.

That's standardization. The national builders use it because it works: the plan is engineered once with a few elevations, the materials list is known, the crews know it by heart, and the price is predictable before anyone breaks ground.

So why is everyone else starting from scratch?

Outside the national builders, almost every project starts from a blank page.

A developer buys land, hires an architect, and draws plans that have never been built before. Then those plans go out to bid, and every bid prices a home no one has built yet. Then the city reviews them from scratch, because it has never seen them either, and so on. This happens all the time with small developments and at scale.

Custom homes alone made up 19.6% of all single-family homes started in 2025, about 1 in 5 (NAHB).

And it's the same story when developers turn to building off-site. They bring a new set of plans to a plant, the plant re-engineers them for its lines, prices them as a one-off, and starts over again on the next project.

Every new plan carries the same hidden costs:

  • Design and engineering, paid again on every project.

  • Pricing from zero, with cushion added because no one has built it before.

  • Permit review from zero. For an average home, getting a permit takes 2 to 3 months, or more than 4 months if it goes before a board (Pew, 2026).

  • Cost of the rules themselves. Regulation already adds about 24% to the price of a new home, roughly $93,870 (NAHB, 2021).

None of these costs add a single square foot. They're the price of treating every home like the first one ever built. And every month a plan spends in design or review is another month of interest, taxes, and insurance on land that isn't earning yet.

Today's developers aren't Levitt, either. You're working lot by lot and town by town, with a different rulebook in each one. That's why the design is the piece worth standardizing: it's the one part of a project you can carry from deal to deal.

"But there's no one-size-fits-all"

That's true, and standardization doesn't pretend otherwise.

Some families need accessible homes. Some lots are narrow. Some towns need duplexes, not single-family homes. A good standard set covers those cases on purpose: a family of plans, each engineered once (per state), with accessible, narrow-lot, and multi-unit versions built in.

What standardization removes is waste, not choice. Most families need the same things from a home: good light, enough bedrooms, a kitchen people want to gather in, storage, and a layout that works for the way they actually live. A home is a home. If we design that well once, with care, and then build it many times, everyone gets a better home for less.

Variety can live where it costs little: the front of the house, the colors, the finishes, the way homes sit on the street. It doesn't have to live in the structure, the engineering and the permit file, where it costs the most.

PART 2 · SECTION 3

Cities are already proving it

The clearest proof is coming from city halls.

~40

cities and counties with pre-approved plans

5 days

to a permit in Claremore, OK

61%

of surveyed cities saved builders a month or more

About 40 U.S. cities and counties now offer pre-approved home plans (Pew, 2026). The city reviews a set of plans once. After that, a builder who uses one of them skips most of the plan review.

The results are real:

  • In Claremore, Oklahoma, permits for pre-approved plans are issued within 5 days, and one builder got his in 24 hours.

  • In a 2025 survey of cities using pre-approved plans, 61% reported saving builders more than a month on permitting (Detroit Justice Center).

  • Ecorse, Michigan, reported saving builders up to $10,000 per home.

That's standardization working at the level that matters most for timelines: the permit.

One caution before you count on it. Most of these programs were written for site-built plans. In many states, a modular home arrives with its own state approval, and the local review covers the foundation and the site. Ask your building department how it handles both before you pick a path.

What this means for developers

If you're building more than one home, standardization is the first lever you control. Right now, that matters more than it has in years: money costs more, crews are thinner, and about 40 cities have already decided to review a plan once rather than every time.

  1. Start from plans that already exist. Pick from a small set of engineered plans instead of drawing new ones for every project.

  2. Fit the plan to the lot, not the lot to a new plan. Start with your site plan, then choose the standard homes that fit each lot. A good set includes narrow-lot and 2- to 4-unit options, so you don't give up yield to use one.

  3. Keep variety on the outside. Change elevations, colors, and finishes. Leave the structure alone.

  4. Use the same plans across projects. Having all projects on the same plan makes your pricing, schedule, and your lender's job easier.

Picture the same 10 lots both ways.

Start from scratch: new drawings, new engineering, bids on a home nobody has built, and a full permit review before the first truck shows up.

Start from a standard plan: the drawings and engineering are done, every bid prices a home that has been priced before, and in a growing number of cities the permit takes days instead of months.

This is how we're building PERCH. We're developing a small set of standard home plans, engineered and stamped for each state's requirements, so a developer can send a site plan and get back only the homes that fit, each with a single price through delivery and set. Foundation, utilities, and site work stay with your site team.

Standardize first, because it unlocks the next key towards affordability.

Standardization on its own doesn't make a home affordable. It makes the next step possible.

A plan is approved once; that's where it starts. What you do with it next is where the speed, the quality, and the savings come from.

Next Friday: Key 2

Each key gets its full breakdown here in THE PLOT. When the series ends, the full white paper comes to you first.

And if you have lots to build on, send your site plan at ownperch.com.

One question for you

Developers: How many of your last projects started from a brand-new plan, and how long did permitting eat up?

Best,

Cam

Meet Gravité: The Men's Cologne Women Love

Buying cologne for the man in your life comes with one big advantage: you get to pick a scent you'll enjoy just as much as he does.

Gravité Cologne by Particle blends bright citrus, warm amber, and aromatic rosemary into a bold, masculine scent that smells sophisticated without being overpowering. Better yet, it’s engineered to last all day, so he can smell great from morning to night.

Black Friday, for a limited time only: use promo code BH30 for 30% off

Sources

  • Levittown, NY: 17,447 homes, 1947 to 1951 (EBSCO Research Starters; History.com). 26-step process (History.com). Up to 30 homes a day by mid-1948 (WTTW, "10 Towns That Changed America"). Typical price $7,990 (Fortune, 2006). Whites-only sales (History.com).

  • U.S. Census Bureau, Survey of Construction, 2025 (8.8-month average build time).

  • D.R. Horton fiscal 2025: 84,863 homes closed (Q4 FY2025 earnings release, Oct 28, 2025); 126 markets, 36 states, largest by homes closed (FY2025 Form 10-K).

  • NAHB, custom homes 19.6% of single-family starts in 2025 (Eye on Housing, Nov 2026).

  • Pew Charitable Trusts, "Preapproved Building Plans Help Cities Improve Housing Affordability," May 2026 (about 40 jurisdictions; 2 to 3 months for a typical permit, 4+ months with a discretionary board).

  • NAHB, "Regulation: 23.8% of the Cost of Building a New Single-Family Home," 2021 ($93,870).

  • Claremore, OK: Strong Towns (Feb 2025); Philadelphia Inquirer (July 2026).

  • Detroit Justice Center 2025 survey (61% saved more than a month) and Ecorse, MI (up to $10,000 per home), via Better Cities Project.